Facilities Master Plan and Measure E Construction Program

Infrastructure Phase II - South Campus

Project Scope

This future Measure E funded project will upsize or replace, as needed, utility and technology services to and around the existing south side of campus. The infrastructure services include electrical service, low voltage (data) service, water service (potable and non-potable), sanitary sewer, and storm water systems

Budget

Currently, this project is budgeted at $15 million. As plans are developed and the project is fully vetted, the preliminary cost estimate may change.

Project Schedule

The estimated construction start of this project is 2nd Quarter 2022

Site Map